Through a competitive process, Utilicast was select to provide display building and application development support for a Northwestern U.S. utility that is upgrading their current Energy Management System (EMS).

July 27, 2019

A California utility hired Utilicast to pursue a resolution to generation station service billing discrepancies between the market operator and the local electric utility.

July 17, 2019

A Northeastern U.S. utility hired Utilicast to perform testing/validation and implementation of Day-Ahead, 7 Day-Ahead and Real-time forecasting for up to 29 wind farms/sites.

July 9, 2019

Utilicast was hired by an ISO/RTO to perform project engineering for a major Energy Management System (EMS) upgrade.

July 8, 2019

A U.S. Market Operator contracted with Utilicast to provide requirements definition, functional/technical design, defect resolution, testing and post-implementation support for their replacement Settlement Management System, Market Settlement System and Transmission Settlement Systems.

July 3, 2019

Utilicast is providing consulting services to a Southwestern U.S. utility for reviewing merchant, back-office and balancing authority operations for EIM performance. At the same utility, Utilicast is also supporting areas impacted by a neighboring utility joining EIM

July 2, 2019

Utilicast contracts to deliver project management services for the replacement of a Midwestern U.S. utility’s existing transmission outage scheduling system and implementation of Sun-Net’s (Integrated Tools for Operations Application or “iTOA”) outage management system including future state process development.

June 2, 2019

Utilicast is working with a software provider on a study for the prototyping and development of an asset optimization engine for microgrids. The microgrid in the study consists of a number of distributed VER including wind and solar generators, BESS ( battery energy storage system), loads including fixed load and interruption load, and a distribution network.

June 1, 2019